SWAT 모형을 이용한 보령댐 도수로 운영 방안 및 정책 연구A Study on the Optimal Operation and Policy of the Boryeong Dam Diverion Pipe Line Using the SWAT Model

Other Titles
A Study on the Optimal Operation and Policy of the Boryeong Dam Diverion Pipe Line Using the SWAT Model
Authors
박범수윤효직홍용석김성표
Issue Date
2020
Publisher
한국물환경학회
Keywords
Boryeong-Dam diversion pipe line; Drought; Operation; Policy; SWAT
Citation
한국물환경학회지, v.36, no.6, pp.546 - 558
Indexed
KCI
Journal Title
한국물환경학회지
Volume
36
Number
6
Start Page
546
End Page
558
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/130909
DOI
10.15681/KSWE.2020.36.6.546
ISSN
2289-0971
Abstract
While industrialization has provided in abundance, the pollution it creates has caused untold damage to the environment, increasing the frequency and severity of natural disasters through changes in global climate patterns. The World Risk Forum’s (WEF) World Risk Report presented the results of a survey of experts from around the world detailing the most influential risk factors over the next decade. Notably, the failure to respond to climate change ranked first and the global water crisis third. The extreme drought in the western Chungnam province was unexpected in 2016. At the time, the water level of Boryeong Dam was drastically decreased due to receiving less than half the average recorded rainfall in the region that year. The Boryeong Dam diversion pipeline has the capacity to solve the water shortage problem between these two regions by providing water from Geumgang to the western part of Chungnam, including Boryeong City. Current weather trends suggest drought is likely to continue in western Chungnam, which uses the Boryeong Dam as an intake source. This makes it necessary to operate Boryeong Dam diversion pipeline in an efficient and effective manner. SWAT is a watershed scale model developed to predict the impact of land management practices on water. The SWAT model was used in this study to evaluate the adequacy of the Boryeong Dam diversion pipeline operational plan by comparing it to present Boryeong Dam diversion pipeline operation. By investigating the number of days required to reach each reservoir stage, we determined that the number of days required to reach the boundary stage was less than that of the current operation. This determination accounts for the caveats that the Boryeong Dam waterway was not operated and only one pump will be operated from October to May of next year. As our results suggest, the most stable operation scenario is to operate two pumps at all times. This can be accomplished by operating two pumps from the caution stage to increase the number of pumps whenever the stage is raised. In addition to the stable operation of the Boryeong Dam pipeline, policy considerations are required with regard to imposing a water use charge on users of the Boryeong Dam region.
Files in This Item
There are no files associated with this item.
Appears in
Collections
Graduate School > Department of Environmental Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Sung pyo photo

Kim, Sung pyo
환경공학과
Read more

Altmetrics

Total Views & Downloads

BROWSE