Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

재구성제조시스템에서 설비배치와 Job Shop 스케줄링의 통합 최적화에 관한 연구

Full metadata record
DC Field Value Language
dc.contributor.author김재혁-
dc.contributor.author서윤호-
dc.date.accessioned2022-04-18T14:42:02Z-
dc.date.available2022-04-18T14:42:02Z-
dc.date.created2022-04-18-
dc.date.issued2022-
dc.identifier.issn1225-0988-
dc.identifier.urihttps://scholar.korea.ac.kr/handle/2021.sw.korea/140306-
dc.description.abstractIn manufacturing systems, the facility layout problem(FLP) and the job shop scheduling problem(JSSP) are two main factors influencing on productivity and efficiency of the systems, and a number of previous researches have dealt with these independently. However, FLP and JSSP need to be considered concurrently because the two factors affect each other’s performance, and the modularity of production lines in reconfigurable manufacturing system(RMS) makes it easy and cost-effective to change the facility layout. In this paper, we proposed an integrated algorithm considering FLP and JSSP simultaneously, and it was compared with a method that considers JSSP only. As a result, it was found that the modularity of RMS was worthwhile and the proposed integrated algorithm was effective in deriving optimal solution combination of FLP and JSSP.-
dc.languageKorean-
dc.language.isoko-
dc.publisher대한산업공학회-
dc.title재구성제조시스템에서 설비배치와 Job Shop 스케줄링의 통합 최적화에 관한 연구-
dc.title.alternativeIntegrated Optimization of Facility Layout and Job Shop Scheduling in Reconfigurable Manufacturing System-
dc.typeArticle-
dc.contributor.affiliatedAuthor서윤호-
dc.identifier.bibliographicCitation대한산업공학회지, v.48, no.1, pp.63 - 73-
dc.relation.isPartOf대한산업공학회지-
dc.citation.title대한산업공학회지-
dc.citation.volume48-
dc.citation.number1-
dc.citation.startPage63-
dc.citation.endPage73-
dc.type.rimsART-
dc.identifier.kciidART002810518-
dc.description.journalClass2-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorFacility Layout Problem(FLP)-
dc.subject.keywordAuthorJob Shop Scheduling Problem(JSSP)-
dc.subject.keywordAuthorReconfigurable Manufacturing System(RMS)-
dc.subject.keywordAuthorIntegrated Optimization-
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Industrial and Management Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE