CLUSTER-BASED PRIORITY LIST GENERATION FOR RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEMS
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ozturk, Ahmet Melik | - |
dc.contributor.author | Lee, Chulung | - |
dc.date.accessioned | 2022-06-12T06:40:56Z | - |
dc.date.available | 2022-06-12T06:40:56Z | - |
dc.date.created | 2022-06-10 | - |
dc.date.issued | 2022 | - |
dc.identifier.issn | 1072-4761 | - |
dc.identifier.uri | https://scholar.korea.ac.kr/handle/2021.sw.korea/142113 | - |
dc.description.abstract | Constructive Heuristics for the Resource Constraint Project Scheduling Problems (RCPSP) are preferred scheduling methods when the project network broadens. Then, to generate a good schedule from these heuristics, the priority list used in the algorithm becomes crucial. This paper proposes a Cluster-Based Priority List (CB-PL) method for generating lists to improve makespans of schedules obtained from constructive heuristics. The method creates more intellectual priority lists that generate lower makespans. The approach is built and fine-tuned upon the existing relative literature. The performance of the method is measured by comparing the makespan results. The experiment for the comparison uses serial and parallel scheduling schemes with seven priority rules. Then the experiment is tested through a set of benchmark data. Finally, schedules obtained through the CB-PL showed significant makespan reductions and increases in an overall number of better solutions. | - |
dc.language | English | - |
dc.language.iso | en | - |
dc.publisher | UNIV CINCINNATI INDUSTRIAL ENGINEERING | - |
dc.subject | CLASSIFICATION | - |
dc.subject | HEURISTICS | - |
dc.subject | ALGORITHM | - |
dc.title | CLUSTER-BASED PRIORITY LIST GENERATION FOR RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEMS | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Lee, Chulung | - |
dc.identifier.doi | 10.23055/ijietap.2022.29.2.7957 | - |
dc.identifier.scopusid | 2-s2.0-85129339587 | - |
dc.identifier.wosid | 000800207400001 | - |
dc.identifier.bibliographicCitation | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.29, no.2, pp.154 - 173 | - |
dc.relation.isPartOf | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | - |
dc.citation.title | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | - |
dc.citation.volume | 29 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 154 | - |
dc.citation.endPage | 173 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Industrial | - |
dc.relation.journalWebOfScienceCategory | Engineering, Manufacturing | - |
dc.subject.keywordPlus | CLASSIFICATION | - |
dc.subject.keywordPlus | HEURISTICS | - |
dc.subject.keywordPlus | ALGORITHM | - |
dc.subject.keywordAuthor | RCPSP | - |
dc.subject.keywordAuthor | Clustering | - |
dc.subject.keywordAuthor | Project network | - |
dc.subject.keywordAuthor | Priority list | - |
dc.subject.keywordAuthor | Heuristic | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
145 Anam-ro, Seongbuk-gu, Seoul, 02841, Korea+82-2-3290-2963
COPYRIGHT © 2021 Korea University. All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.