BESS Deployment Strategy in Jeju Carbon-Free Islands for Reducing Renewable Energy Curtailment
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, Changgun | - |
dc.contributor.author | Im, Seunghyuk | - |
dc.contributor.author | Jung, Jaeyeop | - |
dc.contributor.author | Lee, Byongjun | - |
dc.date.accessioned | 2021-08-30T09:37:06Z | - |
dc.date.available | 2021-08-30T09:37:06Z | - |
dc.date.created | 2021-06-19 | - |
dc.date.issued | 2020-11 | - |
dc.identifier.issn | 1996-1073 | - |
dc.identifier.uri | https://scholar.korea.ac.kr/handle/2021.sw.korea/51924 | - |
dc.description.abstract | Renewable energy curtailment often occurs to accommodate large amounts of renewable energy sources in power systems while maintaining system stability and reliability. Widely known methods, such as new transmission line construction, the introduction of demand-side resources, and the reduction of conventional generator output, can minimize the occurrence of curtailment; however, there are difficulties in introducing them because of social and economic problems. For these problems, the Jeju power system adopted a battery energy storage system (BESS) resource to mitigate the curtailment and secure frequency stability with the high penetration of renewable energy. The small-size Jeju island power system is operated with reliability must-run (RMR) units and high-voltage direct current (HVDC) lines connected to the mainland. Since the number of RMR units contributes to frequency stability by providing inertia, reducing the number of operating units for curtailment mitigation is difficult. Therefore, in this paper, based on the current "Carbon-Free island" policy and operation plan of the Jeju power system, we proposed a BESS for reducing the number of RMR units, observe the effect of reducing curtailment using the BESS, and suggest a practical operation plan to reduce the number of RMR units under conditions that secure frequency stability. | - |
dc.language | English | - |
dc.language.iso | en | - |
dc.publisher | MDPI | - |
dc.subject | SYSTEM | - |
dc.subject | INERTIA | - |
dc.title | BESS Deployment Strategy in Jeju Carbon-Free Islands for Reducing Renewable Energy Curtailment | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Lee, Byongjun | - |
dc.identifier.doi | 10.3390/en13226082 | - |
dc.identifier.wosid | 000594104200001 | - |
dc.identifier.bibliographicCitation | ENERGIES, v.13, no.22 | - |
dc.relation.isPartOf | ENERGIES | - |
dc.citation.title | ENERGIES | - |
dc.citation.volume | 13 | - |
dc.citation.number | 22 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Energy & Fuels | - |
dc.relation.journalWebOfScienceCategory | Energy & Fuels | - |
dc.subject.keywordPlus | SYSTEM | - |
dc.subject.keywordPlus | INERTIA | - |
dc.subject.keywordAuthor | curtailment | - |
dc.subject.keywordAuthor | renewable energy | - |
dc.subject.keywordAuthor | battery energy storage system | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
145 Anam-ro, Seongbuk-gu, Seoul, 02841, Korea+82-2-3290-2963
COPYRIGHT © 2021 Korea University. All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.