Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Advanced planning model of formwork layout for productivity improvement in high-rise building construction

Full metadata record
DC Field Value Language
dc.contributor.authorLee, Dongmin-
dc.contributor.authorLim, Hyunsu-
dc.contributor.authorKim, Taehoon-
dc.contributor.authorCho, Hunhee-
dc.contributor.authorKang, Kyung-In-
dc.date.accessioned2021-09-02T17:09:02Z-
dc.date.available2021-09-02T17:09:02Z-
dc.date.created2021-06-16-
dc.date.issued2018-01-
dc.identifier.issn0926-5805-
dc.identifier.urihttps://scholar.korea.ac.kr/handle/2021.sw.korea/78494-
dc.description.abstractThe recent trend toward irregular shapes in high-rise building construction makes planning formwork layouts a more complex and laborious task that has been mainly conducted by a heuristic method based on the intuitive judgment of formwork engineers. This study suggests a new planning approach integrated with practical software for formwork layout that is optimized for deploying formwork panels around structural obstacles while minimizing manual efforts. The proposed approach uses a harmony search algorithm (HSA); it has demonstrated improvement in work efficiency of formwork and has reduced formwork costs by minimizing both the use of nonstandard panels and the total number of panels. A case verification showed that the proposed planning method provided a 56% decrease in nonstandard panel -covered area with 14.1% lower cost than the previous heuristic approach by a formwork expert. Moreover, the results indicated that HSA was more efficient than the genetic algorithm (GA) in layout planning of formwork panels. The advanced planning method will support formwork engineers and will also contribute to increasing formwork productivity.-
dc.languageEnglish-
dc.language.isoen-
dc.publisherELSEVIER SCIENCE BV-
dc.subjectHARMONY SEARCH ALGORITHM-
dc.subjectOPTIMUM DESIGN-
dc.subjectOPTIMIZATION-
dc.subjectPERFORMANCE-
dc.titleAdvanced planning model of formwork layout for productivity improvement in high-rise building construction-
dc.typeArticle-
dc.contributor.affiliatedAuthorLim, Hyunsu-
dc.contributor.affiliatedAuthorCho, Hunhee-
dc.contributor.affiliatedAuthorKang, Kyung-In-
dc.identifier.doi10.1016/j.autcon.2017.09.019-
dc.identifier.scopusid2-s2.0-85032501929-
dc.identifier.wosid000424071900018-
dc.identifier.bibliographicCitationAUTOMATION IN CONSTRUCTION, v.85, pp.232 - 240-
dc.relation.isPartOfAUTOMATION IN CONSTRUCTION-
dc.citation.titleAUTOMATION IN CONSTRUCTION-
dc.citation.volume85-
dc.citation.startPage232-
dc.citation.endPage240-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaConstruction & Building Technology-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryConstruction & Building Technology-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordPlusHARMONY SEARCH ALGORITHM-
dc.subject.keywordPlusOPTIMUM DESIGN-
dc.subject.keywordPlusOPTIMIZATION-
dc.subject.keywordPlusPERFORMANCE-
dc.subject.keywordAuthorFormwork layout planning-
dc.subject.keywordAuthorOptimization model-
dc.subject.keywordAuthorHarmony search-
dc.subject.keywordAuthorFormwork productivity-
dc.subject.keywordAuthorHigh-rise building construction-
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Cho, Hun Hee photo

Cho, Hun Hee
공과대학 (건축사회환경공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE