Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Customer Earned Value: Performance Indicator from Flow and Value Generation View

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Taehoon-
dc.contributor.authorKim, Yong-Woo-
dc.contributor.authorCho, Hunhee-
dc.date.accessioned2021-09-04T04:23:34Z-
dc.date.available2021-09-04T04:23:34Z-
dc.date.created2021-06-18-
dc.date.issued2016-01-
dc.identifier.issn0742-597X-
dc.identifier.urihttps://scholar.korea.ac.kr/handle/2021.sw.korea/89899-
dc.description.abstractThe earned value method (EVM) is considered an advanced project control technique that provides a quantitative measure of work performance. However, the EVM is effective only under the assumption that every activity is independent. Literature shows that the EVM lacks the value generation view even working against the reliability of workflow. The goal of this research is to propose a project metric system to supplement the EVM in terms of the workflow and value generation. The researchers suggest a new metric of customer earned value (CEV), which is defined as the budgeted amount of work completed and is used by the successors on a network. Through a hypothetical case study, this research investigates how the work-in-process between trades and schedule performance in each trade behave under different uncertainties. The result suggests that the proposed metrics can provide project managers with more relevant managerial information on project progress as well as on the level of collaboration. The proposed system with the EVM would facilitate collaboration on project planning and control where variability and interdependency are involved. (C) 2015 American Society of Civil Engineers.-
dc.languageEnglish-
dc.language.isoen-
dc.publisherASCE-AMER SOC CIVIL ENGINEERS-
dc.subjectMANAGEMENT-
dc.titleCustomer Earned Value: Performance Indicator from Flow and Value Generation View-
dc.typeArticle-
dc.contributor.affiliatedAuthorCho, Hunhee-
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0000377-
dc.identifier.scopusid2-s2.0-84950255871-
dc.identifier.wosid000366650000006-
dc.identifier.bibliographicCitationJOURNAL OF MANAGEMENT IN ENGINEERING, v.32, no.1-
dc.relation.isPartOfJOURNAL OF MANAGEMENT IN ENGINEERING-
dc.citation.titleJOURNAL OF MANAGEMENT IN ENGINEERING-
dc.citation.volume32-
dc.citation.number1-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordPlusMANAGEMENT-
dc.subject.keywordAuthorCustomer earned value-
dc.subject.keywordAuthorEarned value method-
dc.subject.keywordAuthorProject control metric-
dc.subject.keywordAuthorCollaboration-
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Cho, Hun Hee photo

Cho, Hun Hee
공과대학 (건축사회환경공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE