AUTOMATIC DATA PROCESSING SYSTEM FOR INTEGRATED COST AND SCHEDULE CONTROL OF EXCAVATION WORKS IN NATM TUNNELS
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Cho, Daegu | - |
dc.contributor.author | Cho, Hunhee | - |
dc.contributor.author | Kim, Daewon | - |
dc.date.accessioned | 2021-09-05T11:33:37Z | - |
dc.date.available | 2021-09-05T11:33:37Z | - |
dc.date.created | 2021-06-15 | - |
dc.date.issued | 2014-02 | - |
dc.identifier.issn | 1392-3730 | - |
dc.identifier.uri | https://scholar.korea.ac.kr/handle/2021.sw.korea/99342 | - |
dc.description.abstract | A type-based system is widely used for cost and schedule control in the NATM (New Austrian Tunnelling Method) tunnel. This study raises several limitations of the type-based system: a broad level of control, a distributed approach to cost and schedule data, ad hoc management, and difficulty in deriving meaningful data. Integrated cost and schedule control promises a myriad of benefits on both information flow and construction management. Nevertheless, the integrated approach still seems to be a long way from common use in the construction industry because it requires considerable overhead effort to acquire, track, and analyze the integrated data. The objective of this study is to propose a new method to automate the required processes for implementing cost and schedule integration. We propose an operational-level automatic data processing system for cost and schedule integration. The proposed system consists of a real-time location system for detecting equipment locations, a wireless mesh network for transmitting the location signals to a field office, and a prototype model for transforming the signals to cost and schedule data. Technical feasibility is analyzed through a pilot project. The study offers a new approach to facilitating sensor technologies for cost and schedule integration. | - |
dc.language | English | - |
dc.language.iso | en | - |
dc.publisher | VILNIUS GEDIMINAS TECH UNIV | - |
dc.title | AUTOMATIC DATA PROCESSING SYSTEM FOR INTEGRATED COST AND SCHEDULE CONTROL OF EXCAVATION WORKS IN NATM TUNNELS | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Cho, Hunhee | - |
dc.identifier.doi | 10.3846/13923730.2013.801907 | - |
dc.identifier.scopusid | 2-s2.0-84896351779 | - |
dc.identifier.wosid | 000332921700014 | - |
dc.identifier.bibliographicCitation | JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, v.20, no.1, pp.132 - 141 | - |
dc.relation.isPartOf | JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT | - |
dc.citation.title | JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT | - |
dc.citation.volume | 20 | - |
dc.citation.number | 1 | - |
dc.citation.startPage | 132 | - |
dc.citation.endPage | 141 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.subject.keywordAuthor | data integration | - |
dc.subject.keywordAuthor | NATM | - |
dc.subject.keywordAuthor | RTLS | - |
dc.subject.keywordAuthor | wireless mesh network | - |
dc.subject.keywordAuthor | automation | - |
dc.subject.keywordAuthor | information technology | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(02841) 서울특별시 성북구 안암로 14502-3290-1114
COPYRIGHT © 2021 Korea University. All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.