Hardware-in-the-loop simulation for a production system

  • Park, Sang C.
  • Chang, Minho
Citations

WEB OF SCIENCE

19
Citations

SCOPUS

21

초록

This paper proposes a hardware-in-the-loop simulation (HILS) approach for the design and verification of a production system. The design of a production system involves two major activities: mechanical design (device specification and layouts) and electrical design (device behaviour and system control). Conventionally, the mechanical and electrical design activities have been performed sequentially, wasting time. We propose a concurrent procedure of mechanical and electrical design based on the HILS methodology to cope with this problem. The proposed HILS approach provides two major benefits: (1) the verified control program can be directly used for the real plant with minor adaptations; and (2) the verified 3D layout model can be used to generate the detailed drawings for the implementation of the plant. We can minimise the stabilisation time of a production system, since most mechanical and electrical errors can be found and fixed using HILS.

키워드

HILSmechanical designelectrical designphysical modellogical modelTOOLS
제목
Hardware-in-the-loop simulation for a production system
저자
Park, Sang C.Chang, Minho
DOI
10.1080/00207543.2011.575097
발행일
2012
유형
Article
저널명
International Journal of Production Research
50
8
페이지
2321 ~ 2330