Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum

  • Kim, Seong-in
  • Han, Junghee
  • Lee, Youngho
  • Park, Eunkyung
Citations

WEB OF SCIENCE

16
Citations

SCOPUS

19

초록

In this paper, we deal with a new lot-sizing and scheduling problem (LSSP) that minimizes the sum of production cost, setup cost, and inventory cost. Incorporating the constraints of setup carry-ove rand overlapping as well as demand splitting, we develop a mixed integer programming (MIP) formulation. In the formulation, problem size does not increase as we enhance the precision level of a time period; for example, by dividing a time period in to a number of micro time periods. Accordingly, in the proposed model, we treat the time horizon as a continuum not as a collection of discrete time periods. Since the problem is theoretically in tractable, we develop a simple but efficient heuristic algorithm by devising a decomposition scheme coupled with a local search procedure. Even if in theory the heuristic may not guarantee finding a feasible solution, computational results demonstrate that the proposed algorithm is a viable choice in practice for finding good quality feasible solutions with in acceptable time limit. (c) 2009 Elsevier Ltd. All rights reserved.

키워드

Production systemLot-sizing and schedulingHeuristicWARM/COLD PROCESSSETUP TIMES
제목
Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum
저자
Kim, Seong-inHan, JungheeLee, YounghoPark, Eunkyung
DOI
10.1016/j.cor.2009.05.007
발행일
2010-02
유형
Article
저널명
Computers and Operations Research
37
2
페이지
302 ~ 314