The operational efficiency of construction hoists is increasingly important for successful project completion of supertall buildings. In supertall building construction, the traditional power supply using cable systems for construction hoists not only breaks down frequently from its own weight and wind load, but also reduces the maximum payload capacity of the hoist. This study proposes an advanced power supply system of the contact type to enhance operational efficiency and reduce the operation costs of construction hoists. In a field test, the proposed system required only one repair taking 4 h, whereas the cable systems required 21-41 repairs that caused 20-30 days of construction delay. The proposed system also reduced the total operation cost of power supply by up to 22% over the cable systems. Moreover, it could maximize the payload capacity of the hoists. It is expected that the proposed system can reduce the overall construction period with stable operation of the hoists. (C) 2015 Elsevier B.V. All rights reserved.

키워드

Power supplyConstruction hoistOperation efficiencySupertall building
제목
Advanced power supply of construction hoists for supertall buildings
저자
Lim, HyunsuKim, TaehoonJung, Hong-KuCho, HunheeKang, Kyung-In
DOI
10.1016/j.autcon.2015.08.002
발행일
2015-11
유형
Article
저널명
Automation in Construction
59
페이지
48 ~ 58