Flexible double-cage hoist for high operational efficiency in tall building construction

  • Kim, Taehoon; 
  • Lee, Ung-Kyun; 
  • Kim, Seung Woo; 
  • Lim, Hyunsu; 
  • Kim, Chang-Won; 
  • ... Cho, Hunhee; 
  • 외 1명
Citations

WEB OF SCIENCE

9
Citations

SCOPUS

10

초록

High operational efficiency in the use of hoists is crucial for the successful completion of high-rise building projects. Simply increasing the number of hoists may not be possible because of insufficient space or budget limits. However, adopting the "double-deck" concept can be an effective approach to improving the operational efficiency of hoists in projects with such constraints. This study proposes a flexible double-cage hoist for use in such projects. In a case study, we found that combining the proposed hoist with existing single-cage hoists enabled a smaller number of hoists to achieve significantly higher efficiency at lower cost than a group of single-cage hoists. The optimal combination showed a 16.6% decrease in total operational costs and a 7.9% increase in operational efficiency. Using the proposed hoist could therefore enable the successful completion of high-rise building projects at lower cost.

키워드

Flexible double-cage hoist; Hoist; Operational efficiency; Tall building; TRANSPORTATION; SIMULATION
제목
Flexible double-cage hoist for high operational efficiency in tall building construction
저자
Kim, Taehoon; Lee, Ung-Kyun; Kim, Seung Woo; Lim, Hyunsu; Kim, Chang-Won; Cho, Hunhee; Kang, Kyung-In
DOI
10.1016/j.autcon.2018.09.023
발행일
2018-12
유형
Article
저널명
Automation in Construction
권
96
페이지
280 ~ 291