장기모의를 통한 도시유역 비점오염원 처리장치 용량 산정

Determination of Design Capacity for NPS Pollutant Treatment Facilities by Long-term Simulation in Urban Areas
  • 주진걸
  • 유도근
  • 김중훈

초록

In this study, a method to determine the design capacities of nonpoint source (NPS) pollutant treatment facilities in urban areas was suggested. A facility capacity to treat 80 percent of total SS discharge was estimated by 2-year rainfall - runoff - build-up and wash-off simulation at Goonja drainage district in Seoul. For wash-off simulation, four wash-off models (EMC, RC, EXP, and Joo model) were used. As the results, 80 percent of total SS discharge could be treated with only 7.7~31.4% facility capacity of peak flow. The suggested method and results will provide a guideline to determine design capacities of NPS pollutant treatment facility in urban areas.

키워드

Long-term simulationNon-point source pollutantSWMMTreatment
제목
장기모의를 통한 도시유역 비점오염원 처리장치 용량 산정
제목 (타언어)
Determination of Design Capacity for NPS Pollutant Treatment Facilities by Long-term Simulation in Urban Areas
저자
주진걸유도근김중훈
발행일
2011
저널명
한국물환경학회지
27
6
페이지
841 ~ 847