현장 타설 에너지파일을 적용한 지열 히트펌프 시스템의 성능 예측Performance Prediction of Geothermal Heat Pump(GHP) System Using Cast-in-Place Energy Piles
- Other Titles
- Performance Prediction of Geothermal Heat Pump(GHP) System Using Cast-in-Place Energy Piles
- Authors
- 손병후; 정경식; 최항석
- Issue Date
- 2013
- Publisher
- 대한설비공학회
- Keywords
- Cast-in-place energy pile(현장 타설 에너지파일); Ground heat exchanger(지중열교환기); Geothermal heat pump system(지열 히트펌프 시스템); Cooling and heating performance(냉난방 성능); Transient simulation(동특성 시뮬레이션)
- Citation
- 설비공학 논문집, v.25, no.1, pp.28 - 36
- Indexed
- KCI
- Journal Title
- 설비공학 논문집
- Volume
- 25
- Number
- 1
- Start Page
- 28
- End Page
- 36
- URI
- https://scholar.korea.ac.kr/handle/2021.sw.korea/104829
- DOI
- 10.6110/KJACR.2013.25.1.028
- ISSN
- 1229-6422
- Abstract
- The aim of this study is to evaluate the performance of the GHP system with 45 cast-in-place energy piles(CEP) for a commercial building. In order to demonstrate the feasibility of a sustainable performance of the system, transient simulations were conducted over 1-year and 20-year periods, respectively. The 1-year simulation results showed that the maximum and minimum temperatures of brine returning from the CEPs were 23.91℃ and 6.66℃, which were in a range of design target temperatures. In addition, after 20 years’ operation, these returning temperatures decreased to 21.24℃ and 3.68℃, and finally reached to stable state. Annual average extraction heat of cast-in-place energy piles was 94.3 MWh and injection heat was 65.7 MWh from the 20 years of simulation results. Finally, it is expected this GHP system can operate with average heating SPF of more than 3.45 for long-term.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.