Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Hardware-in-the-loop simulation for a production system

Authors
Park, Sang C.Chang, Minho
Issue Date
2012
Publisher
TAYLOR & FRANCIS LTD
Keywords
HILS; mechanical design; electrical design; physical model; logical model
Citation
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.8, pp.2321 - 2330
Indexed
SCIE
SCOPUS
Journal Title
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume
50
Number
8
Start Page
2321
End Page
2330
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/109380
DOI
10.1080/00207543.2011.575097
ISSN
0020-7543
Abstract
This paper proposes a hardware-in-the-loop simulation (HILS) approach for the design and verification of a production system. The design of a production system involves two major activities: mechanical design (device specification and layouts) and electrical design (device behaviour and system control). Conventionally, the mechanical and electrical design activities have been performed sequentially, wasting time. We propose a concurrent procedure of mechanical and electrical design based on the HILS methodology to cope with this problem. The proposed HILS approach provides two major benefits: (1) the verified control program can be directly used for the real plant with minor adaptations; and (2) the verified 3D layout model can be used to generate the detailed drawings for the implementation of the plant. We can minimise the stabilisation time of a production system, since most mechanical and electrical errors can be found and fixed using HILS.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > Department of Mechanical Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE