납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness
- Other Titles
- A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness
- Authors
- 김근형; 고효헌; 백준걸
- Issue Date
- 2011
- Publisher
- 대한안전경영과학회
- Keywords
- Dispatching Rules; Scheduling; Automated Guided Vehicles; Minimum Slack; Dispatching Rules; Scheduling; Automated Guided Vehicles; Minimum Slack
- Citation
- 대한안전경영과학회지, v.13, no.4, pp.125 - 137
- Indexed
- KCI
- Journal Title
- 대한안전경영과학회지
- Volume
- 13
- Number
- 4
- Start Page
- 125
- End Page
- 137
- URI
- https://scholar.korea.ac.kr/handle/2021.sw.korea/114255
- ISSN
- 1229-6783
- Abstract
- Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Industrial and Management Engineering > 1. Journal Articles
![qrcode](https://api.qrserver.com/v1/create-qr-code/?size=55x55&data=https://scholar.korea.ac.kr/handle/2021.sw.korea/114255)
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.