Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness

Other Titles
A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness
Authors
김근형고효헌백준걸
Issue Date
2011
Publisher
대한안전경영과학회
Keywords
Dispatching Rules; Scheduling; Automated Guided Vehicles; Minimum Slack; Dispatching Rules; Scheduling; Automated Guided Vehicles; Minimum Slack
Citation
대한안전경영과학회지, v.13, no.4, pp.125 - 137
Indexed
KCI
Journal Title
대한안전경영과학회지
Volume
13
Number
4
Start Page
125
End Page
137
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/114255
ISSN
1229-6783
Abstract
Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Industrial and Management Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Baek, Jun Geol photo

Baek, Jun Geol
College of Engineering (School of Industrial and Management Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE