Hybrid Multistarting GA-Tabu Search Method for the Placement of BtB Converters for Korean Metropolitan Ring Grid
- Authors
- Labios, Remund J.; Kim, Seungjin; Song, Hwachang; Lee, Byongjun
- Issue Date
- 2016
- Publisher
- HINDAWI LTD
- Citation
- MATHEMATICAL PROBLEMS IN ENGINEERING, v.2016
- Indexed
- SCIE
SCOPUS
- Journal Title
- MATHEMATICAL PROBLEMS IN ENGINEERING
- Volume
- 2016
- URI
- https://scholar.korea.ac.kr/handle/2021.sw.korea/132701
- DOI
- 10.1155/2016/1546753
- ISSN
- 1024-123X
- Abstract
- This paper presents a method to determine the optimal locations for installing back-to-back (BtB) converters in a power grid as a countermeasure to reduce fault current levels. The installation of BtB converters can be regarded as network reconfiguration. For the purpose, a hybrid multistarting GA-tabu search method was used to determine the best locations from a preselected list of candidate locations. The constraints used in determining the best locations include circuit breaker fault current limits, proximity of proposed locations, and capability of the solution to reach power flow convergence. A simple power injection model after applying line-opening on selected branches was used as a means for power flows with BtB converters. Kron reduction was also applied as a method for network reduction for fast evaluation of fault currents with a given topology. Simulations of the search method were performed on the Korean power system, particularly the Seoul metropolitan area.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Electrical Engineering > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.