Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A 97% high-efficiency 6μs fast-recovery-time buck-based step-up/down converter with embedded 1/2 and 3/2 charge-pumps for Li-ion battery managementA 97% high-efficiency 6μs fast-recovery-time buck-based step-up/down converter with embedded 1/2 and 3/2 charge-pumps for Li-ion battery management

Alternative Title
A 97% high-efficiency 6μs fast-recovery-time buck-based step-up/down converter with embedded 1/2 and 3/2 charge-pumps for Li-ion battery management
Authors
Lee, Hyung-Min
Issue Date
14-2월-2018
Publisher
IEEE
Citation
IEEE Int. Solid-State Circuits Conf. (ISSCC)
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/20257
Conference Name
IEEE Int. Solid-State Circuits Conf. (ISSCC)
Place
US
San Francisco, CA, USA
Conference Date
2018-02-11
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Electrical Engineering > 2. Conference Papers

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Hyung Min photo

Lee, Hyung Min
공과대학 (전기전자공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE