Determination of effective parameters on surface settlement during shield TBM
- Authors
- Kim, Dongku; Pham, Khanh; Park, Sangyeong; Oh, Ju-Young; Choi, Hangseok
- Issue Date
- 25-4월-2020
- Publisher
- TECHNO-PRESS
- Keywords
- shield TBM tunneling; surface settlement; effective parameter; Pearson correlation; twin tunnel
- Citation
- GEOMECHANICS AND ENGINEERING, v.21, no.2, pp.153 - 164
- Indexed
- SCIE
SCOPUS
- Journal Title
- GEOMECHANICS AND ENGINEERING
- Volume
- 21
- Number
- 2
- Start Page
- 153
- End Page
- 164
- URI
- https://scholar.korea.ac.kr/handle/2021.sw.korea/56279
- DOI
- 10.12989/gae.2020.21.2.153
- ISSN
- 2005-307X
- Abstract
- Tunnel excavation in shallow soft ground conditions of urban areas experiences inevitable surface settlements that threaten the stability of nearby infrastructures. Surface settlements during shield TBM tunneling are related to a number of factors including geotechnical conditions, tunnel geometry and excavation methods. In this paper, a database collected from a construction section of Hong Kong subway was used to analyze the correlation of settlement-inducing factors and surface settlements monitored at different locations of a transverse trough. The Pearson correlation analysis result revealed a correlation between the factors in consideration. Factors such as the face pressure, advance speed, thrust force, cutter torque, twin tunnel distance and ground water level presented a modest correlation with the surface settlement, while no significant trends between the other factors and the surface settlements were observed. It can be concluded that an integrated effect of the settlement-inducing factors should be related to the magnitude of surface settlements.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.