Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA

Authors
Lee, DongyounLim, HyunsuLee, DongminCho, HunheeKang, Kyung-In
Issue Date
3-Jan-2019
Publisher
SPRINGER
Keywords
delay factor; free-form; tall building; structural framework; FMEA
Citation
INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, v.13, no.1
Indexed
SCIE
SCOPUS
KCI
Journal Title
INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS
Volume
13
Number
1
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/68328
DOI
10.1186/s40069-018-0309-9
ISSN
1976-0485
Abstract
There are many factors in a common building project that are not relevant for free-form tall building projects, for example, the free-form planes or various shapes of buildings. Among the many risks present in particular in structural frameworks, the risk of delays is an important one and has a considerable effect on the entire project performance. Generally, a delay causes a decrease in constructability and an increase in cost, so eventually the productibility of the structural framework would decrease. Delay management of structural frameworks in free-form tall buildings is currently performed by project managers based on personal experience and intuition. This nonsystematic management results from the lack of data that are essential for the planning construction process reflected in the particular considerations of the free-form tall building. This study identified the delay factors that can occur in the structural framework of free-form tall building projects and analyzed priorities for delay management. First, the scope of free-form tall buildings was identified, and particular considerations for the structural framework in their construction were determined, such as plane, elevation, floor height, and structure. Delay factors for each category were recognized through interviews with experts with experience in such projects. To prioritize the delay factors, the occurrence and severity of each factor were surveyed. A risk priority number was calculated from the survey results, and the priority was analyzed. The results of this study could serve as preliminary data for the planning construction process of structural frameworks in free-form tall buildings.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Cho, Hun Hee photo

Cho, Hun Hee
College of Engineering (School of Civil, Environmental and Architectural Engineering)
Read more

Altmetrics

Total Views & Downloads

BROWSE