Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

일체식 교량의 교대와 CFT Pile 연결부 성능에 관한 실험적 연구Experimental Study on Performance of Connection Between the Abutment and CFT Pile in Integral Abutment Bridge

Other Titles
Experimental Study on Performance of Connection Between the Abutment and CFT Pile in Integral Abutment Bridge
Authors
김대혁한상윤이호찬신성진강영종
Issue Date
2016
Publisher
한국복합신소재구조학회
Keywords
integral abutment bridge; CFT pile; connection performance; 일체식 교대 교량; 콘크리트 충전 강관; 연결부 성능
Citation
한국복합신소재구조학회 논문집, v.7, no.3, pp.47 - 54
Indexed
KCI
OTHER
Journal Title
한국복합신소재구조학회 논문집
Volume
7
Number
3
Start Page
47
End Page
54
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/91288
DOI
10.11004/kosacs.2016.7.3.047
ISSN
2093-5145
Abstract
Two types of connection between the abutment and CFT pile were proposed for the sub-structure of the integral abutment bridge. One was a bolt connection (Type-A) and the other was a hook connection (Type-B). To analyze the performance of connection Type-A and Type-B, a quasi-static experiment was carried out. According to experimental results, the destruction occurred at the connection point and so both type A and type B need to have a reinforced design as the link between the abutment and CFT pile. However, when the load resistance performance and energy dissipation capacity was analyzed, the performance of connection Type-B was superior to the performance of connection Type-A.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kang, Young Jong photo

Kang, Young Jong
공과대학 (건축사회환경공학부)
Read more

Altmetrics

Total Views & Downloads

BROWSE