Advanced power supply of construction hoists for supertall buildings
- Authors
- Lim, Hyunsu; Kim, Taehoon; Jung, Hong-Ku; Cho, Hunhee; Kang, Kyung-In
- Issue Date
- 11월-2015
- Publisher
- ELSEVIER SCIENCE BV
- Keywords
- Power supply; Construction hoist; Operation efficiency; Supertall building
- Citation
- AUTOMATION IN CONSTRUCTION, v.59, pp.48 - 58
- Indexed
- SCIE
SCOPUS
- Journal Title
- AUTOMATION IN CONSTRUCTION
- Volume
- 59
- Start Page
- 48
- End Page
- 58
- URI
- https://scholar.korea.ac.kr/handle/2021.sw.korea/91998
- DOI
- 10.1016/j.autcon.2015.08.002
- ISSN
- 0926-5805
- Abstract
- The operational efficiency of construction hoists is increasingly important for successful project completion of supertall buildings. In supertall building construction, the traditional power supply using cable systems for construction hoists not only breaks down frequently from its own weight and wind load, but also reduces the maximum payload capacity of the hoist. This study proposes an advanced power supply system of the contact type to enhance operational efficiency and reduce the operation costs of construction hoists. In a field test, the proposed system required only one repair taking 4 h, whereas the cable systems required 21-41 repairs that caused 20-30 days of construction delay. The proposed system also reduced the total operation cost of power supply by up to 22% over the cable systems. Moreover, it could maximize the payload capacity of the hoists. It is expected that the proposed system can reduce the overall construction period with stable operation of the hoists. (C) 2015 Elsevier B.V. All rights reserved.
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - College of Engineering > School of Civil, Environmental and Architectural Engineering > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.