Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

CMS RPC commissioning of the existing detector during the long shutdown

Authors
Cimmino, A.Ban, Y.Cai, J.Li, Q.Liu, S.Qian, S.Wang, D.Xu, Z.Zhang, F.Choi, Y.Kim, D.Goh, J.Choi, S.Hong, B.Kang, J. W.Kang, M.Kwon, J. H.Lee, K. S.Lee, S. K.Park, S. K.Pant, L. M.Mohanty, A. K.Chudasama, R.Singh, J. B.Bhatnagar, V.Mehta, A.Kumar, R.Cauwenbergh, S.Costantini, S.Crucy, S.Fagot, A.Garcia, G.Ocampo, A.Poyraz, D.Salva, S.Thyssen, F.Tytgat, M.Zaganidis, N.Doninck, W. V.Cabrera, A.Chaparro, L.Gomez, J. P.Gomez, B.Sanabria, J. C.Avila, C.Ahmad, A.Muhammad, S.Shoaib, M.Hoorani, H.Awan, I.Ali, I.Ahmed, W.Asghar, M. I.Shahzad, H.Sayed, A.Ibrahim, A.Aly, S.Assran, Y.Radi, A.Elkafrawy, T.Sharma, A.Colafranceschi, S.Abbrescia, M.Calabria, C.Colaleo, A.Iaselli, G.Loddo, F.Maggi, M.Nuzzo, S.Pugliese, G.Radogna, R.Venditti, R.Verwillingen, P.Benussi, L.Bianco, S.Piccolo, D.Paolucci, P.Buontempo, S.Cavallo, N.Merola, M.Fabozzi, F.Iorio, O. M.Braghieri, A.Montagna, P.Riccardi, C.Salvini, P.Vitulo, P.Vai, I.Magnani, A.Dimitrov, A.Litov, L.Pavlov, B.Petkov, P.Aleksandrov, A.Genchev, V.Iaydjiev, P.Rodozov, M.Sultanov, G.Vutova, M.Stoykova, S.Hadjiiska, R.Ibargueen, H. S.Morales, M. I. P.Bernardino, S. C.Bagaturia, I.Tsamalaidze, Z.Crottyt, I.Kim, M. S.
Issue Date
10월-2014
Publisher
IOP PUBLISHING LTD
Keywords
Gaseous detectors; Particle tracking detectors (Gaseous detectors)
Citation
JOURNAL OF INSTRUMENTATION, v.9
Indexed
SCIE
SCOPUS
Journal Title
JOURNAL OF INSTRUMENTATION
Volume
9
URI
https://scholar.korea.ac.kr/handle/2021.sw.korea/97213
DOI
10.1088/1748-0221/9/10/C10043
ISSN
1748-0221
Abstract
February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 10(34)/cm(2)/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Science > Department of Physics > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher CHOI, Su yong photo

CHOI, Su yong
이과대학 (물리학과)
Read more

Altmetrics

Total Views & Downloads

BROWSE